Calcraft successfully delivered a high-performance 35,000 sq. ft. Pre-Engineered Building (PEB) along with a 2,500 sq. ft. RCC office building for Kumar Tools.
Scope of Work:
- Design Sanctioned and Construction of a Large Industrial Shed with 40-ton Crane Capacity (10-ton x 4 Cranes Configuration)
Value Delivered:
This project optimized production workflows while providing modern office infrastructure, enabling smoother operations and future expansion.
Kumar Toolings & Stamping Pvt Ltd
Delivered efficient space planning with a 35,000 sq. ft. PEB and 2,500 sq. ft. building for seamless operations.